LBA Observing Roster Sep 2009

Hobart/Ceduna LBA observers schedule for September 09 session;

LBA Wiki page for this session

Hobart

Local Date & TimeDescriptionObserver
Thursday 12pm-Friday 8amIVS APSG24 at Hobart with remote observing of VT11U at Ceduna. Followed by set up for VT02N for Ceduna and HobartJay
Friday 8am-4pmvt02N [Freq change?] vc090, v255f. v255f is likely to need changes in the back-end configuration during the experimentWarren
Friday 4pm - Saturday 8 amv255f [Freq change?] vc091 v316aJD
Saturday 8am - Saturday 8 pmv316a [Freq change?] vc092 v255g.v255g is likely to need changes in the back-end configuration during the experimentWarren
Saturday 8pm - Sunday 8amv255g [Rx Change 6.7 -> 8.4 GHz], vc093, v252nJim L.
Sunday 8am - Sunday 8pmv252nJay
Sunday 8pm - Monday 8amv252nWarren

All experiments are at 6.7 Ghz except for vc093 & v252n which are at 8.4 GHz. Details on the backend configurations required will be added when the LBA Wiki has the info. The v255f and V255g experiments will likely require changes to the backend being made during the observations, at both Hobart and Ceduna. Bev and Mark will be at the Ceduna observatory to do this.

Suggested Disk Usage

ExperimentHobartCeduna
   
   
   
   
   

Setup Notes

NOTE: I think that these LO frequencies, DAS profiles are correct, however, please check coherence etc carefully at setup time ase mistakes are always possible.

Hobart

ExperimentAgilent (GHz)LO (SMY)Tone (SML)DAS ProfileNotes
      
      
      
      
      
      
      
      

Ceduna

ExperimentAgilent (GHz)LO (SMY)Tone (SMY)DAS ProfileNotes