LBA Observing Roster Mar 2010
Roster for March 2010LBA Session
The LBA session schedule is at http://www.atnf.csiro.au/vlbi/wiki/index.php?n=Main.LBAMar2010
Day & Date | Start Time (EDT) | End Time (EDT) | Experiments | Frequency & Proposer | Volunteer |
---|---|---|---|---|---|
Tuesday 9/3 | 1400 | 1600 | vt11x | 6.7 GHz, test | Brett & Eric |
Tuesday 9/3 | 1600 | 0900 | vt11x vc104a/b v255i | 6.7 GHz, test 6.7 GHz, test 6.7 GHz, Ellingsen | Simon |
Wednesday 10/3 | 0900 | 1600 | v255i v105 v316c | 6.7 Ghz, Ellingsen 6.7 GHz, test 6.7 GHz, Beasley | Brett & Eric |
Wednesday 10/3 | 1600 | 0900 | v316c vc106 v288a | 6.7 GHz, Beasley 6.7 GHz, test 6.7 GHz, Dodson | Jamie M. |
Thursday 11/3 | 0900 | 1600 | v288a vc107 v190n | 6.7 GHz, Dodson 8.4 GHz, test 8.4 GHz, Deller | Brett & Eric |
Thursday 11/3 | 1600 | 0900 | v190n vc108 v271e | 8.4 GHz, Deller 8.4 GHz, test 8.4 GHz, Petrov | John |
Friday 12/3 | 0900 | 1600 | v271e | 8.4 GHz, Petrov | Brett & Eric |
Friday 12/3 | 1600 | 0900 | v271e vc109 v252p | 8.4 GHz, Petrov 8.4 GHz, test 8.4 GHz, Ojha | Warren |
Saturday 13/3 | 0900 | 2100 | v252p | 8.4 GHz, Ojha | Jay |
Saturday 13/3 | 2100 | 0900 | v252p vc110 v329a | 8.4 GHz, Ojha 8.4 GHz, test 8.4 GHz, Deller | Jim Lovell |
Sunday 14/12 | 0900 | 1500 | v329a | 8.4 GHz, Deller | Shari |
If the observers want to adjust the start and stop times of the shifts, please update this page.
LBA disk schedule - Hobart
The names of the disk sets are currently generic but I'll update the list the next time I'm out at Mount Pleasant.
LBA Disk set | Start Time (EDT) | End Time (EDT) | Experiments | Observer | Change required at the end? |
---|---|---|---|---|---|
UTAS V002A CURT V001B | Tuesday 9/3, 1400 Wednesday 10/3 2300 | Wednesday 10/3 2300 Friday 12/3 0000 | vt11x, vc104a/b, v255i, vc105, v316c vc106, v288a,vc107,v190n | cdisko - UTAS V002A->CURT V001B Swap disks for ATNF V016B & CURT V003A | |
Mark5A disks | Friday 12/3 0000 | Saturday 13/3 0100 | vc108, v271e | Uses Mark5A recorder | |
ATNF V016B CURT V003A | Saturday 13/3 0100 Sunday 14/3 0200 | Sunday 14/3 0200 Sunday 14/3 1500 | vc109, v252p vc110, v329a | cdisko - ATNF V016B->CURT V003A End o' LBA Week! |
All disks have been checked and cleaned. The spare set is UTAS V001A.
LBA disk schedule - Ceduna
The names of the disk sets are currently generic as we don't know what we've been shipped...
LBA Disk set | Start Time (EDT) | End Time (EDT) | Experiments | Observer | Change required at the end? |
---|---|---|---|---|---|
ATNF V010A ATNF V005B | Tuesday 9/3, 1400 Wednesday 10/3 2300 | Wednesday 10/3 2300 Friday 12/3 0000 | vt11x, vc104a/b, v255i, vc105, v316c vc106, v288a,vc107,v190n | cdisko - ATNF V010A->ATNF V005B Swap disks for Set3 & Set4 | |
Set3 Set4 | Friday 12/3 0000 Saturday 12/3 0100 | Saturday 13/3 0100 Sunday 14/3 0200 | vc107, v271e vc108, v252p | cdisko - Set3->Set4 Swap disks for Set5 & Set6 | |
Set5 Set6 | Sunday 14/3 0200 | Sunday 14/3 1500 | vc109, v252p vc110, v329a | cdisko - Set5->Set6 End o' LBA week! |
Disks have not been checked and may contain data. Check that it's not fresh before deleting it!
Experiment Summary - Hobart
Experiment | Rx | Agilent | Pol. | DAS profile | Second LO(s) | Coherence Tone | Nota bene |
vt11x | 6.7 (5) | 12.2 GHz | ???,??? | ????.PRO | ??? MHz | ????? | Test & Setup. Details on the day |
v255i | 6.7 (5) | 12.2 GHz | RCP, LCP | VSOP.PRO | 468 & 810 MHz 810 & 810 MHz | 788.125 830.875 | Two frequency setups. Changes can be automated in the snap file. |
v316c | 6.7 (5) | 12.2 GHz | RCP,LCP | VSOP.PRO | 810 MHz | 830.875 | |
v288a | 6.7 (5) | 12.2 GHz | RCP, LCP | VSOP.PRO | 810 MHz | 830.875 | |
v190n | 8.4 (6) | 14 GHz | RCP, LCP | VSOP.PRO | 777 MHz | 841.4 | |
v271e | S/X (1) | N/A | RCP only | N/A | Test using the Wiltron in the cryo lab. A tone of 8.20001 GHz should appear as the usual 1 kHz phase cal in vc01 | Uses the S/X receiver and the Mark4/Mark5A backend | |
v252p | 8.4 (6) | 14 GHz | RCP only! | VSOP.PRO | 777 MHz 809 MHz | 841.4 844.6 | Do not use the S/X receiver! |
v329a | 8.4 (6) | 14 GHz | RCP,LCP | VSOP.PRO | 777 MHz | 841.4 |
Note that the frequency for the coherence tone refers to the output of the CH 1 band splitter beneath the frequency translator (rack 6). A tone at the given frequency should return a 5 MHz coherence signal from the CH 1 band splitter.
SMY01 should be used for the channel 1 LO of the frequency translator and the SML for channel 2. The upper SMX is used for the tone.
Experiment Summary - Ceduna
Experiment | Rx | Agilent | Pol. | DAS profile | Second LO(s) | Coherence Tone | Nota bene |
vt11x | 6.7 | 11.1 GHz | ???,??? | ????.PRO | ??? MHz | ????? | Test & Setup. Details on the day |
v255i | 6.7 | 11.1 GHz | RCP, LCP | VSOP.PRO | 468 & 810 MHz 810 & 810 MHz | 788.125 830.875 | Two frequency setups. Changes can be automated in the snap file. |
v316c | 6.7 | 11.1 GHz | RCP,LCP | VSOP.PRO | 810 MHz | 830.875 | |
v288a | 6.7 | 11.1 GHz | RCP,LCP | VSOP.PRO | 810 MHz | 830.875 | |
v190n | 8.4 | 13.04 GHz | RCP,LCP | VSOP.PRO | 637 MHz | 841.4 | |
v271e | 8.4 | 13.04 GHz | RCP,RCP | VSOP.PRO | 428 MHz 684 MHz | 820.5 846.1 | Dual frequency. Use SMY01 into LO1 of frequency translator, SMY02 into LO2. |
v252p | 8.4 | 13.04 GHz | RCP,RCP | VSOP.PRO | 637 MHz 669 MHz | 841.4 844.6 | Dual frequency. Use SMY01 into LO1 of frequency translator, SMY02 into LO2. |
v329a | 8.4 | 13.04 GHz | RCP,LCP | VSOP.PRO | 637 MHz | 841.4 |
Note that the frequency for the coherence tone refers to the output of the CH 1 band splitter beneath the frequency translator (rack 6). A tone at the given frequency should return a 5 MHz coherence signal from the CH 1 band splitter.
For the v271e & v252p experiments, we need to be able to change these remotely. If we use SMY01 and SMY02 then Bev doesn't need to make an extra trip out to the station. This does mean that we won't be able to check coherence though.